HSF BOARD OF REVIEW TIMELINE
How Does the HSF Board of Review Timeline Change Your Savannah 203(k) Closing?
The Historic Preservation Ordinance protects 11 districts in Savannah, and any exterior scope visible from a public right-of-way needs a Certificate of Appropriateness from the Board of Review, which meets the second Thursday of every month. Plan for 30 to 45 added days on top of a standard 60 to 90 day 203(k) close.
Protected areas include the Landmark Historic District (anchored by Bull Street and Broughton Street), the Victorian Historic District, Cuyler-Brownville, Streetcar, Thomas Square Streetcar near SCAD, Pin Point, Baldwin Park, and Mid-City. Certificate review covers roof material and color, window replacement, siding, porch repair, exterior paint, and street-facing fenestration. Interior scope, mechanical systems, and electrical rewiring are not reviewed.
The practical Savannah 203(k) sequence runs: signed contract, HUD consultant write-up, Certificate of Appropriateness application with photos and specs, then FHA appraisal ordering. Most applications clear within one to two Board cycles; emergency roof or structural stabilization can be expedited by the Preservation Officer. The Historic Savannah Foundation, a private nonprofit near Wright Square, also runs a Revolving Fund offering below-market bridge financing for stabilization on threatened structures.